Substantial re-think required for data centre design and build

Andrew Fettes-Brown, Rider Levett Bucknall (RLB) Global Board Director, Head of Data Centres at RLB UK and Europe, outlines the results of the company’s recent research, the results of which suggest that the way in which future data centres are designed and built must be substantially rethought to accommodate supply chain constraints and sustainability measures.
DCS talks to EcoCooling at the DCA's 2025 10x10 Event
DCS talks to Legrand at the DCA's 2025 10x10 Event
DCS talks to KPMG at the DCA's 2025 10x10 Event
DCS talks to Sudlows at the DCA's 2025 10x10 Event
DCS talks to RED Engineering at the DCA's 2025 10x10 Event
In this video, DCS talks to SWEP at the DCA's 2025 10x10 Event
In this video, DCS talks to Lenovo at the DCA's 2025 10x10 Event
In this video, DCS talks to Accelsius at the DCA's 2025 10x10 Event