Substantial re-think required for data centre design and build

Andrew Fettes-Brown, Rider Levett Bucknall (RLB) Global Board Director, Head of Data Centres at RLB UK and Europe, outlines the results of the company’s recent research, the results of which suggest that the way in which future data centres are designed and built must be substantially rethought to accommodate supply chain constraints and sustainability measures.
In this video, DCS talks to Schneider Electric at DCW 2025
In this video, DCS talks to Moteurs Baudouin at DCW 2025
In this video, DCS talks to R&M at DCW 2025
In this video, DCS talks to Essentra at DCW 2025
In this video, DCS talks to Airsys at DCW 2025
In this video, DCS talks to ABB at DCW 2025
In this video, DCS talks to VID Firekill at DCW 2025
In this video, DCS talks to Forbo at DCW 2025