Vertiv offers scalable busbar power distribution system

Vertiv™ Powerbar iMPB enables uninterrupted additions, upgrades and service without using floorspace.

Vertiv continues the expansion of its power distribution portfolio with the availability of Vertiv™ Powerbar iMPB, a modular busbar system designed to enable seamless, on-demand power upgrades in dynamic data centre environments. Available in both copper and aluminium conductor offerings, the Vertiv Powerbar iMPB family features capacities from 160 amps to 1,000 amps and delivers reliable overhead power distribution, with the inherent benefit of also maximising cooling airflow. The system is ideal for use in almost any size or style of data centre, as well as laboratories, distribution warehouses, adaptable manufacturing plants and other dynamic environments. The Vertiv Powerbar iMPB is available in North America, Latin America, Asia – including Australia and New Zealand, India, Europe, the Middle East and Africa.

The busway system allows businesses to cost-effectively optimise and adapt power distribution infrastructure over time, maximising availability through continuous power delivery to critical loads. User-friendly tap-off boxes with breaker protection can be placed anywhere along the busway and isolate active IT loads and nearby branch breakers to ensure continuous power delivery. The adaptive busbar comes with a simple sandwich-style joint pack construction that makes installation secure and easy, with no special tooling required. The Vertiv Powerbar iMPB includes a variety of capacity and connection configurations to allow for adjustments and upgrades with minimal outside support and no loss of power to critical loads.

“As more and more devices are added and higher rack densities become commonplace, space is at a premium in today’s data centres,” said Phil O’Doherty, managing director, E&I at Vertiv. “The power infrastructure must keep pace, which means being scalable and quick to deploy. The Vertiv Powerbar iMPB delivers on all fronts with a modular, easy-to-install system that is compact and flexible enough to meet constantly changing demands.”

The Vertiv™ Powerbar iMPB is UL 857 and IEC 61439-2 compliant, and the lightweight aluminium busway track chassis has an IP2X/3X safety rating with integrated finger-safe capabilities and ground-first/break-last design to ensure maximum safety while servicing. With both copper and recyclable aluminium conductor options, the busbar can be configured to meet the conductivity and safety requirements of any installation.

The Vertiv Powerbar iMPB, a mature offering from Vertiv’s E&I brand, will supersede the previous Vertiv™ Liebert® MBX busway product that was available in North America and EMEA, and is compatible with the previous offering. The Vertiv Powerbar iMPB solution complements the Vertiv™ E&I switchgear range to provide a complete power distribution solution.

According to a recently published report from Dell’Oro Group, Data Center Physical Infrastructure (DCPI) revenues grew 9 percent year-over-year in 2Q 2022, driven by average selling price increases and marginal improvement in unit shipments.
Grace Hopper subsea cable ups capacity, connects Lumen landing stations in the US and UK.
ABB’s digital solution cut overall installation and commissioning time by 60% while using 90% less copper.
Uptime Institute’s 2022 Global Data Center Survey findings highlight the growing, industry-wide need to achieve meaningful efficiency gains, evolve sustainability reporting practices, prevent costly outages and more.
The London Internet Exchange (LINX) has announced a strategic collaboration with African Internet Exchange Point, NAPAfrica.
Honeywell Data Center Suite delivers an innovative user experience, increases resiliency in operations, improves worker productivity and provides visibility into critical sustainability KPIs.
The facility is one of the largest in the European Union; part of Corning’s globally focused investment in fibre and cable manufacturing.
Solves critical safety, thermal management and field replacement or upgrade challenges of highly demanding hyperscale data center I/O.